Construction generates drawings, photographs, measurements, requests and decisions every day. Connecting these records creates value when teams can identify the current situation and respond to deviations using verifiable information.

Shared information during construction

buildingSMART’s March 2026 construction openBIM report addresses collaboration and information integration throughout construction. Interoperability is part of the challenge of connecting planning, teams and data.[1]

A case presented at Autodesk University in 2025 describes reality capture and progress analysis on a large project. It is an external example: methods, resources and outcomes must be assessed in the context of each site.[2]

A routine for interpreting progress

When tracking a steel structure, for example, distinguish procurement, fabrication, delivery, erection and verification. A delivered component does not mean a completed activity. Agree on measurement criteria and link each record to its activity, location and design revision.

Meetings become clearer when every issue has an owner, a date and a known impact. Photographs and models help locate a problem; budgets, contracts and planning help interpret its consequences. Review this information together before approving a change.

Digitise a routine with clear ownership

Begin with one work area and a small set of records: current revision, progress, open issues and decisions. Define who updates the information and how the team recognises an outdated record.

A dashboard can make a deviation visible, but correcting it requires a decision and follow-up. Supervision and management need to retain the connection between digital records and what was actually observed on site.

A brief for organised project monitoring

  • Contract scope, schedule, budget and measurement criteria.
  • Work areas, design revisions and available site records.
  • Decision owners, priority issues and the update routine.
Keep in mind

Useful data supports a decision. Records should make clear what was planned, observed and approved.

Related video

Video in English 2024

A connected workflow

buildingSMART explains the openBIM workflow and information exchange across teams and tools.

The YouTube player loads when you click Play. If it does not load, follow the link to watch on YouTube.

Sources & references

Materials from the named organisations and authors. Dates below refer to the sources, where provided.

  1. buildingSMART International · 2026 · PDFConstruction openBIM — Industry Insight
  2. Autodesk University · 2025From Reality to Results: Robotics, Reality Capture and AI

Summaries of the cited sources and practical applications developed by Hypercube.